Hotel Maintenance Management: Reporting, Assigning and Tracking Jobs

How to replace radio calls and sticky notes with a maintenance process where every fault is reported, assigned, tracked and closed.

24 August 2026·5 min read·Staybase
Hotel Maintenance Management: Reporting, Assigning and Tracking Jobs

In most hotels, faults are reported by radio, by a note on the maintenance office door or by a word in the corridor. Some get fixed the same hour; others are forgotten until a guest complains. This article explains how to set up a maintenance process where every fault is recorded, assigned and tracked, and how planned checks fit alongside reactive jobs.

Why informal reporting fails

Radio calls and sticky notes feel fast, and for urgent problems they are. The trouble starts with everything that is not urgent:

A small maintenance team in a busy hotel cannot hold all of this in their heads. The fix is not more meetings; it is a single place where every job lives.

The Staybase maintenance list, with priorities, owners and overdue jobs marked.
The Staybase maintenance list, with priorities, owners and overdue jobs marked.

Step 1: make reporting easy from any phone

If reporting a fault takes longer than walking to the maintenance office, people will keep walking. The report form should open on any phone and ask only for what the engineer needs:

Housekeeping, front of house, kitchen and the duty manager should all be able to report. Guests can report too, if the hotel offers a simple way to do it from the room, which avoids a call to reception for a problem that only maintenance can fix.

Step 2: assign every job to one person

A job that belongs to "maintenance" belongs to nobody. Each job should have a named owner, even in a team of two. The head of maintenance or the duty manager assigns new jobs at the start of each shift and whenever an urgent one comes in. The owner can then update the status, add notes and photos, and close the job when it is done.

Agree a short list of statuses that everyone understands, for example:

StatusMeaning
NewReported, not yet looked at
In progressSomeone is working on it
Waiting for partsDiagnosed, but parts or a contractor are needed
DoneFixed and ready for the person who reported it to check
ClosedConfirmed and finished

"Waiting for parts" is worth having on its own. It separates jobs that are stuck for a known reason from jobs that are being ignored.

Step 3: set target times and track overdue jobs

Not every job needs to be done today, but every job needs a target. A simple rule set is usually enough: urgent jobs within a few hours, high priority the same day, normal within a few days. What matters is that the target is written down and that overdue jobs are visible to the person who can act on them.

A board view helps here. When jobs are shown as cards in columns by status, a column full of old cards is hard to miss. Review overdue jobs at the daily operations meeting, and ask one question for each: what is needed to close it?

Step 4: keep the history

Every comment, status change and photo should stay with the job. This history is useful in three ways:

Step 5: separate planned checks from reactive jobs

Reactive jobs are faults that someone reports. Planned checks are routines that happen whether or not anything is wrong: weekly fire alarm tests, monthly emergency lighting tests, flushing little-used water outlets, checking pool and spa readings. They need a different tool. A planned check has a schedule, a set of questions or readings, and a record that it was done on time.

The link between the two is important. When a planned check fails, for example a hot-water outlet below its target temperature, it should create a maintenance job with the reading attached, so the fault is fixed and not only recorded.

Reactive jobs answer "what is broken?". Planned checks answer "how do we know it is working?". A hotel needs both, and a failed check should become a job.

Summary checklist

How Staybase handles this

The Staybase Maintenance module replaces radio calls and notes with tickets. Staff create a ticket on a computer or in the Staybase app on their phone, with a title, location, priority from low to urgent, a description and attachments, and can add photos straight from the phone camera in comments. Where a hotel uses in-room tablets, guests can report a problem from a "Report an issue" tile, and a ticket is created for that room.

Each ticket is assigned to one person. Teams switch between a table view and a Kanban board, and managers can drag cards between columns with an optional comment. Each hotel defines its own statuses with colours and a target time in hours, and tickets that pass it are marked as overdue. Every comment and status change appears in the ticket timeline. Notifications go by email, to Microsoft Teams and as push notifications to managers' phones. Managers with several hotels can view one hotel or all of them, and tickets export to PDF and CSV.

Planned checks run in the Staybase Compliance module on daily, weekly or monthly schedules. If the same piece of equipment fails its check several times in a row, Staybase opens a high-priority maintenance ticket with the recent readings. To see it with your own team's jobs, book a demo at staybase.co.uk.